Tuesday, September 11, 2007

The Section Path


The Building Section is through the south portion of the building. The first Floor is exhibition Space. Moisture and insulation barrier does to the underside of the floor above.
The planters are partially insulated so as not to freeze the root system of the extensive green roof.
Hollow core plank will provide a chase for some heating. Planks will provide both ventilation and chase for electrical without having to use the space between the ceiling and bottom of the 8" hollow core plank system. Additional sway frame will be placed in the back and side walls and in the shaft area to provide additional stiffness during erection.